If your permit application has been delayed, the problem is often the site plan.
Building departments review hundreds of applications each week. If your drawing is incomplete or unclear, it will be returned for corrections.
Below are the most common site plan mistakes that cause delays — and how to avoid them.
1️⃣ Missing Property Line Dimensions
Every site plan must clearly show:
- Full property boundaries
- Length of each property line
- Lot dimensions
If property lines are not labeled correctly, reviewers cannot verify setbacks.
This is one of the top reasons permits are delayed.
2️⃣ Incorrect or Missing Setbacks
Setbacks are minimum required distances between structures and property lines.
Common mistakes include:
- Not labeling setback distances
- Placing structures inside setback
- Using outdated setback requirements
- Miscalculating corner lot setbacks
Even small errors can trigger a revision notice.
3️⃣ No Scale Indicated
A site plan must be drawn to scale.
Rejected drawings often:
- Do not show scale
- Are not proportionate
- Use inconsistent measurements
Without scale, the building department cannot confirm compliance.
4️⃣ Easements Not Shown
Many properties contain:
- Utility easements
- Drainage easements
- Access easements
Failing to show easements — or building inside one — is a major mistake.
Cities immediately flag these issues.
5️⃣ Missing Distances Between Structures
If you’re adding:
- A pool
- A deck
- A shed
- A fence
- A septic system
- A driveway
Your site plan must show the distance from the proposed structure to:
- Property lines
- House
- Other structures
- Wells or septic systems (if applicable)
Missing measurements cause automatic delays.
6️⃣ Illegible or Poorly Formatted Drawings
Presentation matters.
Common formatting mistakes include:
- Blurry scans
- Cropped documents
- Handwritten notes that are hard to read
- Overlapping text
- Missing labels
Building reviewers must be able to clearly read your site plan.
7️⃣ Incomplete Lot Layout
Your site plan must show the full property — not just the new structure.
Common omissions include:
- Driveways
- Existing sheds
- Fences
- Septic systems
- Pools
- Adjacent streets
Incomplete lot layout often results in a correction request.
8️⃣ Forgetting the North Arrow
Many cities require a north arrow on the site plan.
It may seem minor, but missing required elements can delay approval.
9️⃣ Not Verifying Local Requirements
Every city has different zoning rules.
Mistakes happen when applicants:
- Assume setback distances
- Use another city’s rules
- Ignore special zoning overlays
- Skip reviewing city checklists
Always verify local requirements before submission.
10️⃣ Submitting a Rough Sketch Instead of a Scaled Drawing
Some cities allow homeowner-drawn plans.
However, rough sketches often lack:
- Accurate measurements
- Proper scale
- Clear labeling
- Complete layout
This leads to revisions, delays, and frustration.
A professionally prepared site plan reduces this risk.
How to Avoid Permit Delays
To avoid common site plan mistakes:
- ✔ Use accurate property dimensions
- ✔ Label all setbacks clearly
- ✔ Show easements
- ✔ Include scale and north arrow
- ✔ Show all existing and proposed structures
- ✔ Double-check measurements
- ✔ Follow your city’s checklist
A properly prepared site plan speeds up the review process.