Omaha Driveway Widening Permit Site Plan: Proposed Paving, Property Lines and Garage Access
Ready to plan your Omaha driveway widening?
Get a clear site drawing showing the existing driveway, proposed paving, property boundaries and garage access.
Order Your Omaha Driveway Site Plan
USA Site Plans provides unsigned drawings. Confirm your permit office’s drawing and survey requirements before ordering.
Widening your driveway can make garage access easier or create more room beside an existing parking space. Before hiring a paving contractor, organize a drawing that shows exactly what will change.
An Omaha driveway widening permit site plan should clearly distinguish existing concrete from proposed paving. It should also show how the addition fits within the property and whether it changes the driveway entrance at the street.

Does widening a driveway require an Omaha permit?
Omaha Public Works requires a Drive Approach/Curb Cut Permit for modifications to a curb, driveway approach or vehicle access within the public right-of-way. The application includes a site plan, and permit issuance follows City Traffic Engineer approval and payment of applicable fees. [1]
Identify whether your project changes the street entrance or only adds paving farther inside the lot. If the work stays entirely on private property, ask Omaha Permits and Inspections which permits and zoning reviews apply. The right-of-way permit guidance alone does not establish that private paving is exempt.
When describing the project, explain whether you are widening the entrance, adding a strip beside the driveway, creating a parking pad or replacing existing pavement. Include the proposed use of the extra space.
Show existing and proposed paving separately
The reviewer and contractor should be able to identify the new work immediately. Use different hatching or shading for the existing driveway and proposed addition, with a simple legend.
For a clear drafting request, provide:
- Existing driveway: its width, route and connection to the garage.
- Proposed widening: the added strip’s width and length.
- Finished layout: the total driveway width after the work.
- Removal areas: pavement or other features that will be removed.
- Street entrance: any changes to the approach, curb opening or sidewalk crossing.
For example, if you are adding a strip beside the existing driveway, label both the strip width and the completed width. A single dimension labeled “driveway” can leave the scope unclear.
Include the frontage features Omaha asks to see
Omaha’s driveway guidelines call for a sketch or plot plan showing the proposed construction, property lines, adjacent driveways and nearby obstructions. The listed features include streetlight standards, poles, signs, sidewalk boxes and fire hydrants. [2]
Send photos of the driveway entrance and surrounding frontage with your drawing request. Identify relevant features that may be difficult to see in an aerial image. This is particularly useful where landscaping hides a hydrant, utility box or neighboring entrance.
Keep property lines and the public right-of-way clear
Show the side property boundary nearest the proposed paving and label the distance between them. Also identify the street frontage and right-of-way boundary where reliable records establish them.
Do not assume the curb, sidewalk or fence marks your legal property boundary. Omaha Public Works describes the local GIS map as a reference and recommends a professional survey company for a precise boundary assessment. [3]
Provide any available survey or recorded plat. If the boundary is uncertain, have it resolved before relying on a proposed paving edge. An unsigned site drawing does not establish a legal property line.
Ask the reviewing department to confirm applicable paving location, parking and coverage limits for your parcel. A proposed addition being inside the lot does not, by itself, establish that the design is permitted.
Show how the widened driveway serves the garage
Include the house and garage footprint, the vehicle door location and the driveway approach to that door. Explain whether the additional paving is intended for maneuvering, parking or both.
Omaha’s driveway guidelines state that vehicles using an approved approach must be able to park entirely on private property. The guidelines also establish residential approach design standards, so the entrance dimensions should be checked against the City’s requirements. [2]
Show nearby steps, gates, retaining walls and landscaping that affect the usable space. If the widened area tapers toward the garage, dimension that shape rather than drawing it as a uniform rectangle.
Coordinate sidewalk and drainage details with your contractor
Mark the sidewalk crossing and any proposed changes near the curb. An overhead layout helps describe the project, but it does not establish pavement grades, concrete specifications or an accessible sidewalk profile.
Omaha Public Works publishes current standard plates, including Concrete Driveway Plate 501-13 and sidewalk construction details. Your contractor should confirm which current details apply to the permitted work. [4]
Provide notes about existing drainage problems, low areas or planned grading. Ask whether the scope needs additional drainage or engineering information. For larger projects, Omaha’s stormwater program can require a Post Construction Stormwater Management Plan; the City’s guidance generally identifies projects disturbing more than 5,000 square feet. That threshold should not be treated as an exemption from other project requirements. [5]
If requested, organize existing and proposed paved areas for calculations. Our lot coverage and impervious surface guide explains the information to gather.
What to send when ordering your driveway site plan
Once you have confirmed the drawing scope with the permit office, gather the following:
- Property address and any available survey or recorded plat.
- A marked sketch showing the proposed paving addition.
- Existing driveway dimensions and proposed finished dimensions.
- Photos of the entrance, garage and nearby obstructions.
- Notes describing changes to the curb, approach or sidewalk.
- Written permit office requirements or reviewer comments.
In the order comments, specify “Omaha driveway widening” and explain which pavement remains, which pavement is added and whether the entrance changes. The USA Site Plans Basic Site Plan is currently listed at $99 with PDF output included and an option to attach supporting files. [6]
USA Site Plans provides unsigned site drawings. Surveys, stamped engineering plans and detailed paving construction documents must be arranged separately when required.
Common questions before ordering
Can I widen the driveway without widening the curb opening?
Show that proposal clearly and ask the City to confirm the applicable review. Keeping the street entrance unchanged does not automatically resolve private-property paving or parking requirements.
Will an aerial image be enough?
It may help explain the existing layout, but it cannot verify legal boundaries or all frontage obstructions. Provide supporting records and site measurements, and arrange a survey if boundary verification is needed.
Does ordering a site plan guarantee approval?
No. The City reviews the proposed work and complete application. Confirm whether an unsigned drawing fits the requested scope before ordering.
Put your driveway widening project on a clear plan
Send your proposed paving dimensions, garage access details and supporting property records to USA Site Plans.
Order Your Omaha Driveway Widening Site Plan
Unsigned drawings. Confirm current permit requirements for your address and proposed work.
Sources
- Omaha Public Works: Drive Approach/Curb Cut Permit.
- City of Omaha: Guidelines and Regulations for Driveway Location, Design and Construction.
- Omaha Public Works: Encroachment Permit and boundary reference guidance.
- Omaha Public Works: Standard Plates and Specifications.
- Omaha Public Works: Post Construction Stormwater Management.
- USA Site Plans: Basic Site Plan order form.
Sources checked October 4, 2026. Confirm jurisdiction, current design standards and submission requirements for your property before construction.