Wichita Shed Permit Site Plan: Easements, Property Lines and Required Measurements
Need a site plan for your Wichita shed?
Show your proposed shed, existing buildings, property boundaries and documented easements on a clear residential property layout. USA SITE PLANS offers unsigned site plans starting at $99.
Order Your Wichita Shed Site Plan →
Confirm MABCD’s requirements for your project before ordering. Our drafting service does not establish legal boundaries or replace required surveying or engineering.
Buying a backyard shed in Wichita? Before you arrange delivery or pour a pad, prepare a drawing that shows exactly where the shed will go. A permit reviewer needs to understand its size, its distance from property lines and whether its location conflicts with an easement or another site restriction.
A Wichita shed permit site plan turns your proposed location into a clear, dimensioned layout. Start with your property documents, shed specifications and a marked-up sketch, then have those details organized into a drawing for your application.

Does a small Wichita shed still need a site plan?
A building-permit exemption does not necessarily mean no permit is needed. Wichita’s published Unified Building and Trade Code provides a location-permit process for qualifying small detached accessory structures. That process requires a site plan so staff can check the proposed location for conflicts involving easements, setbacks, flood hazards and neighboring property. [1]
Before ordering, ask the Metropolitan Area Building and Construction Department (MABCD) whether your shed needs a location permit, building permit or additional documents. Confirm the current size limits and rules for your address using the department’s current adopted codes page. Wichita city limits and unincorporated Sedgwick County have different provisions.
MABCD’s permit guidance lists a site plan for detached accessory structures and explains that staff checks zoning, jurisdiction, easements and rights-of-way during the application process. [2]
What should your shed site plan show?
For an efficient drafting order, provide enough information to place the shed accurately and explain its relationship to the rest of the property. Use this practical checklist, alongside any project-specific instructions from MABCD.
- Property address and lot information: include your legal description or parcel details when available.
- Property boundaries: show documented lot dimensions and identify the front, rear and side boundaries.
- Existing buildings: identify the house, garage and other accessory structures.
- Proposed shed: label its width, depth, floor area and proposed location.
- Separation distances: show distances to the relevant property lines and nearby buildings.
- Recorded easements: supply their documented locations, widths and descriptions.
- Other relevant features: identify paving, fences, utility information and known drainage or flood restrictions affecting the location.
- Drawing information: include a scale, north arrow and clear existing/proposed labels.
Our Wichita site plan guide provides broader context for other residential projects.
Check easements before choosing the shed location
A fence or an open patch of lawn does not tell you whether a recorded easement exists. Provide the relevant plat, survey or recorded easement document so the drawing can show the restriction in the right place.
If the shed footprint, pad or roof projection appears to enter an easement, resolve that issue before finalizing the layout. Wichita publishes a separate Use of Easement permit process for encroachments into utility or drainage easements. The existence of that process does not mean your proposed shed will be allowed there. [3]
Tell your drafter where the easement is documented. Do not ask them to guess its width from an aerial photograph. If the records are unclear, obtain clarification from the appropriate city department or a qualified surveyor.
Provide measurements from the shed to the property lines
Measure from a confirmed boundary rather than assuming the fence sits on the legal line. If you cannot confidently identify the boundary, seek surveying help before choosing the final shed position.
The most useful measurements for your drafting instructions are:
- Shed width and depth, with dimensions identified as wall, foundation or overall roof measurements.
- Proposed distance to the rear property line.
- Proposed distance to the nearest side property line.
- Distance to the house, garage and other nearby structures.
- Roof overhang and pad dimensions where they extend beyond the shed walls.
Ask MABCD which parts of the structure control the applicable separation measurements. Your drawing should distinguish actual proposed distances from required minimum distances.
For example, a 10-by-12-foot shed has a 120-square-foot footprint. That calculation helps describe the project; it does not establish that the shed is exempt or that the chosen location complies.
What to send when ordering your plan
Prepare these items before completing the order form:
- Your property address and any permit instructions already received.
- A survey or recorded plat showing available boundary and easement information.
- Shed specifications showing size, height, roof projections and intended use.
- A marked-up sketch identifying the proposed location and measured distances.
- Relevant photographs and notes about existing buildings or features to be removed.
Include any planned electrical service, plumbing or change of use in your project description so the permitting authority can advise on the complete scope.
Order an unsigned residential site plan from USA SITE PLANS
USA SITE PLANS can organize your supplied property and project information into an unsigned residential site layout. The online order form lists a basic plan at $99, includes PDF delivery and accepts supporting attachments. [4]
Confirm that an unsigned drawing is suitable for your application. Boundary surveys, structural calculations, foundation design and professional seals are separate services when required. The site plan communicates the proposal; the permitting authority decides whether it complies.
Frequently asked questions
Does a prefabricated shed remove the need for a site plan?
Manufacturer drawings describe the product. A property-specific layout shows where it will be installed. Confirm the permit and location requirements before scheduling delivery.
Can you find every easement from the property address?
Do not rely on the address alone. Supply recorded documents identifying easements. A drafting service cannot certify that all legal restrictions have been discovered.
What if I change the shed location?
Have the drawing updated and ask MABCD whether the change needs review before installation. Keep your proposed layout, application and installed location consistent.
Ready to prepare your Wichita shed site plan?
Send your property information, shed dimensions and proposed location. Get a clear layout showing the details needed to explain your project.
Order Your Wichita Shed Site Plan →
Plans starting at $99. Unsigned residential drafting; confirm your permit requirements before ordering.
Sources
- [1] Wichita–Sedgwick County Unified Building and Trade Code, published September 2024 compilation: residential accessory structure and location-permit provisions. Check current adopted codes and amendments for your application.
- [2] MABCD: Permits and detached accessory structures
- [3] City of Wichita: Traffic, Street and Construction Permitting, including Use of Easement permits
- [4] USA SITE PLANS: Order Your Site Plan
USA Site Plans